“EmX” Bus Rapid Transit Corridor | Eugene/Springfield , Oregon
Lane Transit District | Wildish Building Co.
This project included construction of a 14 mile round trip Bus Rapid Transit (BRT aka EmX) system from downtown Eugene to Springfield, Oregon. Construction consisted of 29 concrete bus platforms with steel canopies; extensive traffic control modifications; installation and implementation of GPS controlled signals; significant artwork fabrication and installation; extensive concrete flatwork, curb and gutter and asphalt work; and rerouting of existing utilities.