Winston-Dillard Water Treatment Plant | Winston , Oregon
City of Winston | Wildish Construction Co.
Upgrades to this 3.75 million gallon water treatment plant required rock excavation, soil stabilization, erosion control, installation of water and drain piping, sanitary and storm sewer lines with manholes, controlled density and structural backfill, electrical trenching, perimeter foundation drainage, concrete curbs and pads, and asphalt paving.