Sheldon High School Baseball Backstop Extension | Eugene , Oregon

$190,964

Sheldon High School | Wildish Building Co.

At Sheldon High School in Eugene, Wildish provided a new 40ft tall x 100ft long backstop extension to the existing baseball field. The project included installing eleven 8in diameter x 50ft long posts into a concrete pier and grade beam.