I-84 Cascade Locks – Hood River Bridge Replacement/Rehabilitation | Cascade Locks , Oregon
ODOT | Wildish Standard Paving Co.
This project consisted of the replacement of two structures and rehabilitation of four structures including placement of 48-inch precast box beams, attachment of a precast arch façade to the outer box beams, shear dowel placement to the underside of existing bridge girders, fiber wrap placement and post tensioning on existing bridge abutments using up to 50-foot long drilled and grouted tensioning rods, and replacement of the pin and hanger assemblies.