I-105 Washington Jefferson Willamette River Bridge | Eugene , Oregon
ODOT | Wildish Standard Paving Co.
This project upgraded seven bridges at the West end of I-105 with new wearing surfaces, bridge rail, bridge joints, deck strengthening, illumination, impact panels and moment slabs as well as seismic upgrades and bridge drainage. An eighth unused, outdated overcrossing bridge was backfilled with cellular concrete, the superstructure removed and replaced with new concrete paving.