Before football facilities at the University of Oregon’s Autzen Stadium could be expanded, underground utilities needed to be relocated. This project involved bulk excavation, erosion control, curb and gutter removal and replacement, installation of a 36-inch storm sewer line and a 24-inch sanitary sewer line 13 feet below existing grade, relocation of irrigation lines, traffic control, subsurface and base rock placement, asphalt paving, permanent markings and landscape restoration.